Exterior Waterproofing and Sump Pit/Pump Installation

July 2024

Excavation and Drainage Installation: Excavated area below footer. Installed clear washed stone. Installed perforated drain tile. Installed footer drain clean-outs. Installed filter fabric to prevent settlement into drain tile. Ensured drain tile was discharged to the appropriate area. Power washed the foundation. Applied waterproofing membrane and allowed ample time for curing. Backfilled the excavation area. Sump Pit and Pump Installation: Excavated a hole at the designated area for the sump pit. Installed a new 24" x 18" diameter sump pit embedded in 3/4" washed stone. Installed a Pit Boss Pro Sump Pump. Installed sump pump discharge to the appropriate area with a 1 1/2" quiet check valve.

DateJuly 2024
LocationCrete, IL
Tags

Waterproofing, Sump Pit, Sump Pump, Filter Fabric, Drain Tile, Stone, Clean-Outs, Quiet Check Valve

Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services
Exterior Waterproofing and Sump Pit/Pump Installation by Allied Water Services