

Airplane Hanger using Domino with Blue
This large shop / airplane hanger was completed in 2 days. We coated the main area while repairing cracks and then coated the bathroom and other adjacent rooms.




















This large shop / airplane hanger was completed in 2 days. We coated the main area while repairing cracks and then coated the bathroom and other adjacent rooms.