

Pelican Landing Fitness & Tennis Court Parking Lot Stormwater System Maintenance
Cleaning out stormwater catch basins and digging out ther over basin area. Over time sediment filled this area in burying the overflow pipe that connects to the overflow catch basin causing an increase in erosion and parking lot flooding during the rainy season. With the system cleaned and overflow basin unburied the system should now be able to flow properly, reducing flooding risks and surrounding infrastructure damages during this upcoming rainy season.


























