
- Commercial Abatement
Commercial Abatement plus reconstruction
March 2025
EASE performed abatement of about 350 sqft of triple-layer VCT flooring and mastic from two bathrooms and a hallway, including full containment, flooring removal down to the slab, and prepping walls for waterproofing. After cleaning, the area passed final air clearance for safe re-entry. Reconstruction included rebuilding partition walls, drywall and paint work, and installing new floor tile.
Legal disposal, Material Handler, PPE, Proper removal, Commercial Abatement






















Commercial Abatement plus reconstruction
EASE performed abatement of about 350 sqft of triple-layer VCT flooring and mastic from two bathrooms and a hallway, including full containment, flooring removal down to the slab, and prepping walls for waterproofing. After cleaning, the area passed final air clearance for safe re-entry. Reconstruction included rebuilding partition walls, drywall and paint work, and installing new floor tile.
March 2025
Charleston, SC
Legal disposal, Material Handler, PPE, Proper removal, Commercial Abatement




















