• Air Source Heat Pump Installation

🔥 True “No-Disruption” Gas to Heat Pump Swap

January 2026

We removed an existing gas boiler and installed an air source heat pump—retaining all existing radiators and the hot water cylinder. This was a genuine no-disruption installation: ✔ No radiator changes ✔ No cylinder replacement ✔ No pipework alterations ✔ No property upheaval The entire installation was completed in a single day, meaning the customer experienced no downtime to heating or hot water at any point. By utilising the Boiler Upgrade Scheme (BUS), the overall cost was comparable to a traditional gas boiler swap, proving that switching to a heat pump does not have to be expensive or disruptive. In addition to the physical install, we fully optimised the system for smart operation, integrating: Homely smart controls Weather compensation Low-and-slow heat pump operation for maximum efficiency and comfort The result is a future-proof, low-carbon heating system that delivers the same comfort as a boiler—without the gas, without disruption, and without increased cost.

DateJanuary 2026
LocationBrough, England
Tags

Ideal HP290, Air Source Heat Pump Installation

🔥 True “No-Disruption” Gas to Heat Pump Swap by Elite Services Group Ltd
🔥 True “No-Disruption” Gas to Heat Pump Swap by Elite Services Group Ltd
🔥 True “No-Disruption” Gas to Heat Pump Swap by Elite Services Group Ltd
🔥 True “No-Disruption” Gas to Heat Pump Swap by Elite Services Group Ltd