

Moisture Barrier, Mold Clean, Structural Repair, Dehumidifier, R19 Insulation.
This job included removal of sub-flooring in the dining room, and sistering new floor joists. We installed new sub-flooring in the dining room area. We removed all debris and insulation, performed a full Mold cleaning, installed an Aprilaire Dehumdifier, new R19 insulation, new crawlspace door, and some foundation vent wells.















































