Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.

Subfloor Repair / Partial Remodel

• Floor joists that were affected by the water damage and dry rot were sistered to strengthen them and ensure sturdy support for the floor. • New subflooring was laid. • Toilet angle stops were replaced. • Hung sheet rock in preparation for a local drywall professional to tape, mud and texture. • New toilet installed. • New bidet toilet attachment installed. • A new tile floor was laid to match the rest of the existing tile in the bathroom. • Baseboards installed and painted. • Flooring transition installed between carpet and tile portions of the bathroom. • Painted remodeled portion with customer provided paint to match the rest of the bathroom.

Date Published

December 2024

Project Location

Sacramento, CA

Project Tags

Baseboard, Subfloor, Angle Stop, Toilet, Bidet, Tile, Sheetrock, Paint, Partial Bathroom Remodel

Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.
Subfloor Repair / Partial Remodel by McCray's Handyman, Inc.