- 2nd Floor ducted system - PEAD
Pead installation for future finished attic
March 2024
For this project, we installed two PEAD Style air handlers, one for each side of the house. They were installed in which will be the knee wall of the future finished space. Additionally, this particular customer agreed to a small soffit in front of the window that will become a small bench. The window will only be able to be open thru the top sliding glass and it will be tempered glass with higher resistance to damage.
PEAD Air handlers, 2nd Floor ducted system - PEAD



















Pead installation for future finished attic
For this project, we installed two PEAD Style air handlers, one for each side of the house. They were installed in which will be the knee wall of the future finished space. Additionally, this particular customer agreed to a small soffit in front of the window that will become a small bench. The window will only be able to be open thru the top sliding glass and it will be tempered glass with higher resistance to damage.
March 2024
Greenland, NH
PEAD Air handlers, 2nd Floor ducted system - PEAD