

Newnan One Life - Master renovation
Locker Installation WLR and MLR locker renovation including removal of existing lockers, surface preparation, and installation of new Florence Walnut lockers, cubbies, trims, and fillers. Mirrors, Backsplash & Countertops Removal of existing mirrors and ceramic backsplash. Installation of 340 sqft of mosaic tile, grout, seven new mirrors, HardieBacker, blocking, vanity skirting, and new granite countertops with mitered 6" fronts and required support. Turf Area Removal of existing adhesive, Ardex skim coating where needed, and installation of 2,235 sqft of interior turf. Posing Room Removal of existing wallpaper and LVP, floor preparation, and installation of new Caribou LVP. Walls were skimmed, primed, and painted Gale Force, with the ceiling painted black. Custom framing was built for angled mirrors and LED lighting, including plywood backing and channels for the lighting system.


























































