

Burke OLF - Wall protection and rubber monster tiles installation
Gym renovation including rubber wall protection installation with wood trim detailing throughout the space. Scope included installation of 1x6 top rails, bases, mirror trim, 1x3 corner trims, luan backing, and complete finishing and painting of trim components. The project also included removal of existing rubber flooring and installation of new rubber flooring, along with installation of 220 Monster 2’x2’ gym floor tiles for a durable, high-performance training surface.








