• Meter/main panel

400a meter/main upgrade for Solar/EV's

September 2022

400a meter/main upgrade for Solar/EV's. PG&E required 3" underground pvc relocation for surface mounted installation.

DateSeptember 2022
LocationEl Dorado Hills, CA
Tags

400a, Square D, Meter/main panel

400a meter/main upgrade for Solar/EV's by Peach Electric Inc