Commercial EPDM Re-Roof From Rhino Roofing LLC
This roofing project assembly started from a full tear off of the existing roofing system to the metal B deck. It was 655 total yards of removal. STEP 1 Vacuum all gravel rock performed by Rhino Roofing LLC STEP 2 Install 2 layers of Ridged Insulation above roof deck approximately 5.2" thick STEP 3 Install 60 mil Reinforced EPDM mechanically attached. Step 4 Install all pipe jacks and other penetration details including 220 Pitch Pans. STEP 5 Obtain manufacturers inspection and issue warranty paperwork