
- Solar Project
Atul Apte - Solar
April 2026
Atul is moving forward with an 8.36 kW solar system with 40 kWh of Enphase batteries. We will be installing the IQ6 Combiner with the Enphase meter collar. They are completing a remodel and have requested that we run the conduit through the inside of the walls before finishing. Clear Solar has been scheduled do the site visit on Monday (8/18) to get all of the electrical information, measure the panels on the roof and come up with the conduit run. Once we have that information we will need to put together a single line diagram and ideally get out by Friday 8/22 to install the conduit run. The customer would also like us to install the solar flashings in the roof before they finish the reroof. We built in the conduit run, presite visit and sperate truck role for the solar flashing installation into the pricing. The roof has already been framed so we are good to measure and do the site visit. The roof will be comp. The conduit will be dropped into the garage which is where they want the 40 kWh of enphase batteries installed. We will be installing (19) Silfab QD 440 watt panels and (19) Enphase IQ8M microinverters.
Solar Project






































































































Atul Apte - Solar
Atul is moving forward with an 8.36 kW solar system with 40 kWh of Enphase batteries. We will be installing the IQ6 Combiner with the Enphase meter collar. They are completing a remodel and have requested that we run the conduit through the inside of the walls before finishing. Clear Solar has been scheduled do the site visit on Monday (8/18) to get all of the electrical information, measure the panels on the roof and come up with the conduit run. Once we have that information we will need to put together a single line diagram and ideally get out by Friday 8/22 to install the conduit run. The customer would also like us to install the solar flashings in the roof before they finish the reroof. We built in the conduit run, presite visit and sperate truck role for the solar flashing installation into the pricing. The roof has already been framed so we are good to measure and do the site visit. The roof will be comp. The conduit will be dropped into the garage which is where they want the 40 kWh of enphase batteries installed. We will be installing (19) Silfab QD 440 watt panels and (19) Enphase IQ8M microinverters.
April 2026
San Jose, CA
Solar Project




































































































