A 36-by-21-foot concrete slab with a thickened perimeter footing, doweled into the existing slab. The homeowners wanted to extend their outdoor living space with a large new concrete slab, built so a roof could go over it later. We removed the grass, graded and compacted the subgrade, dug a 16-by-12-inch footing around the perimeter, and laid a 6-mil vapor barrier under the slab. After setting two rows of #5 rebar in the footing and wire mesh across the slab, we pump-poured 3000 PSI small-rock concrete with microfiber reinforcement and gave it a broom finish. To keep the new slab and the old one working as one surface, we drilled and set steel dowels into the existing slab every two feet before pouring.
Outdoor Living Construction









Patio Slab Extension — Venice
A 36-by-21-foot concrete slab with a thickened perimeter footing, doweled into the existing slab. The homeowners wanted to extend their outdoor living space with a large new concrete slab, built so a roof could go over it later. We removed the grass, graded and compacted the subgrade, dug a 16-by-12-inch footing around the perimeter, and laid a 6-mil vapor barrier under the slab. After setting two rows of #5 rebar in the footing and wire mesh across the slab, we pump-poured 3000 PSI small-rock concrete with microfiber reinforcement and gave it a broom finish. To keep the new slab and the old one working as one surface, we drilled and set steel dowels into the existing slab every two feet before pouring.
May 2026
Venice, FL
Outdoor Living Construction