The new piping was installed for both the water supply and drainage by measuring and cutting the necessary pipes to fit the space. The pipes were securely aligned and properly supported with brackets and clamps. The new piping was connected to the existing water supply lines, ensuring a tight seal with pipe tape and sealant to prevent leaks. Under the kitchen sink, the old piping and drain assembly were removed, and new supply lines and a P-trap were installed. Once everything was secured, a leak check and water flow test ensured everything was working properly. For the new bathtub installation, the old tub was removed, and the new one was carefully positioned in place. The drain assembly was installed, and the water supply lines were connected to the faucet. The tub drain was properly aligned with the main drainage system, ensuring the correct slope for drainage. Once secured, the tub was tested for leaks, and the water flow was verified to ensure everything was functioning as it should.