• Electric Service/Panel Upgrade

200A Service Upgrade

October 2025

ZAM replaced the deteriorating 100A electrical service with a new 200A setup. The upgrade included updated main grounding with a water bond and protection of load-side wiring using PVC conduit. All work was completed to code and included permit filing and third-party electrical inspection. A whole house surge protector was also installed to enhance system safety.

DateOctober 2025
LocationNewburgh, NY
Tags

Electric Service/Panel Upgrade

200A Service Upgrade by ZAM Electric
200A Service Upgrade by ZAM Electric
200A Service Upgrade by ZAM Electric
200A Service Upgrade by ZAM Electric
200A Service Upgrade by ZAM Electric