

Generac 26kW Generator Installed with Transfer Switch – Powered by ZAM
Installed 26kW Generac generator on leveled gravel pad, bolted to base. Included battery and cold weather kit. Installed 200A ATS and tied into electrical system. Ran conduit for generator/control wiring. Installed ground bars, separated grounded/grounding conductors, and added load shed module. Ran gas piping from meter to generator. Activated system with Generac, set time/date/exercise schedule, and verified voltage under simulated outage.





