
- Commercial Roofing Installation
Commercial OC TruDefiniton Duration Roof Installation | Ridgeland, MS
March 2026
installed 400 sq duration estate gray installed bullet boots installed setups replaced box vents replaced ridgevent replaced turbines installed drip edge (white) addressed all flashing and replaced if needed removed stucco to replace broken framing repaired and painted stucco installed tpo painted fascia
Owens Corning TruDefinition Duration Shingles, Commercial Roofing Installation







Commercial OC TruDefiniton Duration Roof Installation | Ridgeland, MS
installed 400 sq duration estate gray installed bullet boots installed setups replaced box vents replaced ridgevent replaced turbines installed drip edge (white) addressed all flashing and replaced if needed removed stucco to replace broken framing repaired and painted stucco installed tpo painted fascia
March 2026
Ridgeland, MS
Owens Corning TruDefinition Duration Shingles, Commercial Roofing Installation





