• Waterproofing

Injection of Foundation Crack

August 2025

Crack injection procedure: • Mechanical and chemical surface preparation of the concrete substrate surrounding the crack • Installation of surface-mounted injection ports and sealing of the crack with epoxy adhesive to contain injection material • Injection of high-velocity, hydrophobic polyurethane resin under pressure to achieve full-depth penetration and expansive reaction for structural sealing and water mitigation

DateAugust 2025
LocationChicago, IL
Tags

Polyurethane Injection, Waterproofing

Injection of Foundation Crack by Allied Water Services
Injection of Foundation Crack by Allied Water Services
Injection of Foundation Crack by Allied Water Services