• Sewer

Re Routing of Sewer in Crawl Space

August 2025

• Strategically excavate on the east side of the property to access the existing 21" sanitary sewer main located within the front yard easement—executed with precision and care at an approximate depth of 17 feet • Expertly tap into the municipal sewer using advanced core drilling, followed by secure installation of a core saddle for optimal system integrity • Lay high-performance 6" SDR 26 sewer pipe, professionally embedded in ¾" clean stone to ensure long-term durability and efficient drainage • Seamlessly connect to the new building drain exiting from the east side of your home, completing the system with flawless integration • Incorporate a clean-out access point in the yard to provide convenient, future-proof access for maintenance and inspection

DateAugust 2025
LocationGlen Ellyn, IL
Tags

Sewer Pipe, Sewer

Re Routing of Sewer in Crawl Space by Allied Water Services
Re Routing of Sewer in Crawl Space by Allied Water Services
Re Routing of Sewer in Crawl Space by Allied Water Services
Re Routing of Sewer in Crawl Space by Allied Water Services
Re Routing of Sewer in Crawl Space by Allied Water Services
Re Routing of Sewer in Crawl Space by Allied Water Services
Re Routing of Sewer in Crawl Space by Allied Water Services
Re Routing of Sewer in Crawl Space by Allied Water Services