

Dead Valley & Chimney Repair Project in Moore, SC
Another roof leak fixed the right way. This homeowner was dealing with leaks only 8 months after another contractor installed a shingle section in a dead valley and improperly flashed the chimney. Our team removed the failed roofing materials, rebuilt the dead valley using a modified bitumen roll roofing system designed for low-slope applications, and installed new chimney flashing to create a durable, watertight seal. Using the right roofing material in the right application makes all the difference. Modified bitumen provides superior protection in areas where traditional shingles are more prone to failure.





