Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems

Solar Panel Installation and a MSP Upgrade

Located in New York, this project involves the installation of 14 TRINA395 solar panels on roof #1 with a 25-degree pitch. The roof has been surveyed, indicating a 98% TSRF. No battery or tree removal is necessary for this installation. The utility meter and main breaker are situated at the utility pole in front of the house. As a result, the Balance of System (BOS) components must be located at the house. The electrical subpanel is congested and features an oversized breaker. It has been determined that swapping the Main Service Panel (MSP) over and sourcing a new main breaker would streamline the installation process.

Date Published

June 2023

Project Location

East Durham, New York

Project Tags

Solar Panels, Solar Panel Installation

Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems
Solar Panel Installation and a MSP Upgrade by Infinity Solar Systems