

Solar Panel Installation and a MSP Upgrade
Located in New York, this project involves the installation of 14 TRINA395 solar panels on roof #1 with a 25-degree pitch. The roof has been surveyed, indicating a 98% TSRF. No battery or tree removal is necessary for this installation. The utility meter and main breaker are situated at the utility pole in front of the house. As a result, the Balance of System (BOS) components must be located at the house. The electrical subpanel is congested and features an oversized breaker. It has been determined that swapping the Main Service Panel (MSP) over and sourcing a new main breaker would streamline the installation process.











