

Solar Panel Installation and MSP Upgrade
We installed 17 SEG 410 panels paired with IQ8 PLUS inverters as part of the solar panel system. Additionally, they performed an MSP (Main Service Panel) swap due to the absence of a main breaker and the need to replace feeders with a plastic coating. As for the tree removal, Tree Service was contracted to remove two Silver Maple Trees. Central Hudson was contacted to relocate their guide wire, allowing for the complete removal of the tree.









