Septic System Installation with Aeration System and Chambers
The project involved the comprehensive installation of a new septic system with the following key components: Installation of Holding Tank and Aeration Unit: A 1060-gallon IM holding tank was installed, paired with a 500 GPD Delta aeration unit to facilitate effective wastewater treatment. Installation of Lift Station: A 560-gallon lift station was installed, equipped with a high-water alarm and an effluent pump to ensure proper water management and alert systems. Leech Field Header Installation: A leech field header was installed to distribute wastewater evenly across nine fingers, promoting effective soil absorption. Infiltrator Chamber System Installation: A total of 536 linear feet of the Infiltrator chamber system was installed, creating a seepage field covering 2680 square feet. Field Backfill: The area around the new installation was backfilled to secure the system and ensure proper coverage. Electrical Installation: Electrical connections were made from the main panel to the new system. This required two open slots on the panel for the installation of two 20 AMP breakers.