Septic System Installation with Aeration and Chamber Drainage
Existing Tank Removal: Pumped out all sludge and water, followed by the demolition of the existing tank and backfilling the area with dirt. Building Drain Connection: Connected the building drain to a new 560-gallon IM trash tank. Aeration System Installation: The trash tank will flow into a 1,060-gallon tank equipped with a Delta EcoPod-N Aeration System, capable of treating up to 500 gallons per day (GPD). A 1" poly tubing was installed, running from the air pump and control panel to the aeration tank. Discharge and Drainage Field Installation: Installed a discharge pipe that directs treated effluent to a chamber drainage field. The field will consist of 404 linear feet, covering approximately 2,020 square feet. The field base will be no more than 17" in depth and will utilize serial distribution for efficient wastewater management.