

Delta Pod 500 GPD Aeration Unit Installation
The project involved the installation of a Delta Pod 500 GPD Class 1 Aeration Unit. The unit was equipped to handle up to 500 gallons per day, ensuring efficient wastewater treatment for the property. As part of the installation, a 1,000-gallon cleaning tank was set up, featuring an aerator pipe and a media filter installed inside the tank to facilitate the breakdown of waste materials. The aeration system was integrated, ensuring optimal oxygenation for the treatment process. Electricity was routed to the control module to power the system. Additionally, air poly tubing was installed from the compressor to the tank, allowing for efficient air distribution within the system. The installation was completed by connecting the inlet and outlet for the second tank, ensuring a smooth flow of wastewater through the treatment process. The Delta Pod 500 GPD Aeration Unit was successfully commissioned, providing a reliable and effective solution for wastewater management.


